BPC PowerMaster Manuel du propriétaire

Naviguer en ligne ou télécharger Manuel du propriétaire pour Mesure, test et contrôle BPC PowerMaster. BPC PowerMaster Owner`s manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 24
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
78-1640-250
8/14
Lionel
Block Power
Controller 2 (BPC2)
Owner's Manual
LCS PDI CABLES
use either connector
AC PowerPROGRAM
A U A U
BPC2
BLOCK BLOCK
COMM
COMM
8 7 6 5 4 3 2 1
6-81640
Vue de la page 0
1 2 3 4 5 6 ... 23 24

Résumé du contenu

Page 1 - Owner's Manual

78-1640-250 8/14LionelBlock Power Controller 2 (BPC2) Owner's ManualLCS PDI CABLESuse either connectorAC PowerPROGRAMA U A UBPC2BLOCK BLOCKCOMMC

Page 2 - Congratulations!

10Installing LCS with Legacy AND TrainMaster Command Bases (continued)Your system should resemble the figure below. Once connected and powered-up, the

Page 3

11Installing a new LCS system with NO Command BaseThe Layout Control System can be used without a Lionel Command base. This would be appropriate for a

Page 4 - How it works!

12Installing additional LCS devicesThis section describes adding a new device to an existing Layout Control System installation. If you are installing

Page 5 - LCS BPC2 Module

13Configuring Your BPC2The illustration below shows the name and location of each switch, connector and indicator light on your LCS BPC2 module. The f

Page 6

14Connect Accessory Transformer to Relay Power TerminalsYour BPC2 requires an external power source to operate its 8 internal relays. This must be sup

Page 7

15Understanding BPC2 Software ConfigurationYour BPC2 software configuration is a single operation that controls four distinct areas:1. Track Addressi

Page 8

16Configuring the BPC2 for TRACK AddressesYourBPC2canbeaddressedaseitheraTR(Track)deviceoranACC(Accessory).Thefeatures available in bo

Page 9

17Configuring the BPC2 for ACCESSORY AddressesTo configure your BPC2 for ACCESSORY-Address Operation:1. Turn power to your command base and LCS syste

Page 10 - (continued)

18Track Power Wiring examplesThis section of the manual describes configuring the BPC2 for operation of up to 8 individual track power blocks. Track p

Page 11

19LCS PDI CABLESuse either connectorAC PowerPROGRAMA U A UBPC2BLOCK BLOCKCOMMCOMM8 7 6 5 4 3 2 16-81640Ground/UPower/ATRACKPOWERFigure 11. A single

Page 12 - To LCS module or

2Congratulations!Your layout has always been more than the sum of its parts. But until now, combining those parts into a complete system could be a ch

Page 13 - Configuring Your BPC2

20Wiring four all 8 power blocks to a single transformerTo connect all eight track power blocks to a single track power transformer using your BPC2, r

Page 14

21Wiring multiple blocks in two power districtsIn the example below, two separate Track Power transformers are used, creating two separate "power

Page 15

22Controlling Tracks wired to the BPC2To address your switch, press TR or ACC and the TMCC ID# of the block on the CAB remote controller. Be sure to e

Page 16

23Appendix Operation of LEDsOn power up, the Red LED on your BPC2 will turn on for 1 second. If it remains on continuously, this indicates a problem w

Page 17

©2014 LIONEL L.L.C., CONCORD, NC 28027UNITED STATES OF AMERICAPRINTED IN CHINALionel Limited Warranty Policy & ServiceThis Lionel product, includi

Page 18 - Track Power Wiring examples

3The following Lionel marks are used throughout this Owner’s Manual and are protected under law. All rights reserved.Lionel®, LionChief™, LionChief Pl

Page 19

4What is Lionel’s Layout Control System?LCS doesn’t replace your existing Lionel Legacy Control system. It adds to it! You can control your layout fro

Page 20

5LCS BPC2 ModuleThe BPC2 module is designed to be connected to track power blocks on your model railroad layout. Blocks are isolated track sections mo

Page 21

6Installing Your First LCS DeviceThe following section describes installation of a new LCS system. If you already have installed your first LCS compon

Page 22

7Installing a new LCS system with a Legacy BaseTo install a new LCS system on a layout with a Legacy Command Base:1. Turn off power to your layout an

Page 23 - Appendix

8Installing a new LCS system with a Base-1LTo install a new LCS system on a layout with a Base-1L Command Base:1. Turn off power to your layout and B

Page 24 - PRINTED IN CHINA

9Installing LCS with Legacy AND TrainMaster Command BasesThe following instructions apply ONLY if you are using one or more original CAB-1 remotes wit

Commentaires sur ces manuels

Pas de commentaire